Lift motor room
A lift (or elevator) is a form of vertical transportation between building floors, levels or decks, commonly found in multi-storey buildings.
A lift motor room (sometimes referred to as an elevator machine room), is a room that houses the machinery and electrical controls that operate a lift.
A lift motor room will typically contain:
- Electrical disconnects.
- Machine (geared, gearless or drum type).
- Machine brake.
- Drive motor.
- Encoder.
- Motor generator set.
- Selector.
- Counterweight governor.
- Rope gripper.
- Light fixtures and light control switch.
- Fire alarm devices.
- Hoist beam.
- HVAC equipment.
- Deflector sheaves.
Typically, the entrance to a lift motor room is located in a public corridor, but the room should be fully enclosed or otherwise secured against non-authorised access.
A lift motor room should be well-ventilated and provided with a controlled environment to prevent damage to the equipment. A lifting beam on the ceiling and a floor hatch should be included so that heavy machinery and parts can be winched in and out of the room.
For traction lifts, the room is usually located above the hoistway of the lift that is served by the equipment. This is often on a rooftop of a building or two storeys above the highest storey that the lift serves.
The room can also be found on the ground floor or in the basement if overhead space is unavailable. In this case, the lift cable is a complete chain with an unpowered sheave at the top of the shaft and a powered sheave at the bottom. It may also be on the ground floor or in the basement in the case of hydraulic lifts.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.