Lift motor room
A lift (or elevator) is a form of vertical transportation between building floors, levels or decks, commonly found in multi-storey buildings.
A lift motor room (sometimes referred to as an elevator machine room), is a room that houses the machinery and electrical controls that operate a lift.
A lift motor room will typically contain:
- Electrical disconnects.
- Machine (geared, gearless or drum type).
- Machine brake.
- Drive motor.
- Encoder.
- Motor generator set.
- Selector.
- Counterweight governor.
- Rope gripper.
- Light fixtures and light control switch.
- Fire alarm devices.
- Hoist beam.
- HVAC equipment.
- Deflector sheaves.
Typically, the entrance to a lift motor room is located in a public corridor, but the room should be fully enclosed or otherwise secured against non-authorised access.
A lift motor room should be well-ventilated and provided with a controlled environment to prevent damage to the equipment. A lifting beam on the ceiling and a floor hatch should be included so that heavy machinery and parts can be winched in and out of the room.
For traction lifts, the room is usually located above the hoistway of the lift that is served by the equipment. This is often on a rooftop of a building or two storeys above the highest storey that the lift serves.
The room can also be found on the ground floor or in the basement if overhead space is unavailable. In this case, the lift cable is a complete chain with an unpowered sheave at the top of the shaft and a powered sheave at the bottom. It may also be on the ground floor or in the basement in the case of hydraulic lifts.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.